Here are several major projects currently under construction:

Baruch College

Field Building Renovations

The Lawrence and Eris Field Building, Baruch’s 284,000-square-foot facility at 17 Lexington Avenue in Manhattan, was built in 1928 on the original site of The City College of New York. Since then, it has been used continuously with minimal upgrades. This project will renovate the building in phases, beginning with an infrastructure upgrade and continuing with the renovation of its 16 stories.

Rendering of the Field Building, Baruch College

Borough of Manhattan Community College

Comp VFD Upgrades-Ph3

Renovation and Upgrades to 32 existing Variable Frequency Drive Units at 199 Chambers Street. Scope of work includes pre-functional testing adjustment, renovation or replacement of these units

BMCC construction site for Computer VFD installation

Bronx College

Boiler Plant Replacement

This project includes the replacement of three, forty-five-year-old boilers, with three 800 horse-power, fire tubes Johnston Boilers, associated piping and equipment. Four underground fuel oil storage tanks and associated piping have also exceeded their useful like and require replacement.

Bronx construction site at Boiler Plant

Bronx Express Renovation

The Bronx Express, to be located in Meister Hall, will integrate Bursar, Admissions, Registrar Financial Aid and Advisement to facilitate a high level of service for students as they advance from Admissions through registration and enrollment each semester.
The project includes interior renovation of approximately 24,000 square feet for offices, services desks, waiting area, restrooms and a new elevator.

Bronx construction site at Bronx Express

Fire Alarm Upgrade 12 Buildings

The fire alarm systems of several buildings on campus have reached the end of their useful life. Many of the existing system’s components are no longer available to maintain the systems in working order. Due to the inability to obtain the necessary parts, the systems cannot be fixed and cannot be approved by the New York Fire Department.
The buildings of highest priority are being addressed in this project are Nichols Hall, Bliss Hall, Alumni Gym, Gould Hall, Guggenheim Hall, Philosophy Hall, Loew Hall, Colston Hall, Community Hall, Havemeyer Lab & Annex, Language Hall and Butler Halls.

Bronx construction site for fire alarm work

Brooklyn College

East Quad Utilities, Paving & Landscape Improvements

Brooklyn College’s East Quad is being revitalized to address long-standing issues with aging utilities, deteriorated walkways, and stressed landscape areas. Much of the Quad’s infrastructure has exceeded its service life, and the surrounding trees and plantings have been impacted by wear, contamination, and environmental challenges. This project reimagines the East Quad as a safer, more resilient, and more welcoming campus centerpiece. Upgraded utilities, reconstructed pathways, improved accessibility, and renewed plantings, including a restored tree canopy, will create a healthier, sustainable landscape that enhances daily campus life. When completed, the East Quad will offer reliable modern infrastructure, safer circulation, and a refreshed green space that strengthens both the beauty and long-term performance of the campus.

BC construction site at East Quad

Ingersoll Hall – Acid Tank Renovation

The Ingersoll Hall Acid Tank Renovation is revitalizing essential building infrastructure by replacing deteriorated sanitary and acid-waste piping systems that have outlived their service life. The project includes installing new piping and ejector systems, refurbishing the existing acid neutralization tank, and applying a protective epoxy lining to extend its long-term performance. Work also involves the safe removal of hazardous materials through carefully managed demolition, containment zones, and regulated waste-handling procedures. These upgrades will deliver a safer, more dependable, and fully code-compliant waste management system that supports the building’s laboratory operations. Once completed, the improvements will reduce maintenance needs, enhance operational reliability, and strengthen the overall safety and performance of Ingersoll Hall.

BC construction site at Ingersoll Hall

Performing Arts Center Performing Arts Center

The College’s performing arts facilities were constructed in the mid-20th Century and cannot accommodate the modern program amenities needed by today’s students. This new facility will provide theater performance space, rehearsal and practice rooms, teaching studios, set construction and recording studios.

Performing Arts Center, Brooklyn College

City College Campus

Advanced Science Research Center and New City College Science Facility

The new Advanced Science Research Center will provide a 206,000-square-foot research facility to support the concept of an integrated university, providing state-of-the-art laboratories for ³Ô¹ÏÊÓÆµ’s top research faculty in nanoscience, photonics and environmental remote sensing. A second 190,000-square-foot science lab building will provide new facilities for City College’s Science Division. The two buildings share the ground floor, which houses a clean room, specialized equipment core facilities and a vivarium.

Rendering of the ASRC, Advanced Science Research Center at CCNY

New York City College of Technology

Academic Building

This project will address the college’s acute space deficit by building an approximately 350,000-square-foot facility on the site of the Klitgord Building. The new building will be a mixed-used facility with classrooms, computer labs, science labs, a 1,000-seat auditorium, physical education facilities, administrative offices, student services, a nursing simulation center and a dental hygiene clinic.

Rendering of new Academic Building, New York College of Technology

CUNYSchool of Law

AV Technology System & Community Room Renovation

CUNYSchool of Law is upgrading its Community Room and key learning spaces with modern interiors and fully integrated AV/IT systems. The Community Room renovation includes new finishes, improved layouts, and upgraded building systems to create a flexible, accessible space for events and academic activities. Campus-wide technology upgrades will introduce new projection systems, displays, microphones, speakers, and control panels to classrooms, the moot court, auditorium, and the Community Room. These enhancements will support hybrid instruction, public programs, and community engagement with reliable, state-of-the-art technology. Once completed, the project will deliver adaptable, technology-rich spaces that improve comfort, usability, and the overall learning experience for students and visitors.

Law construction site for AV technology installation

Graduate Center

Big Data Consort CUNY2020

Renovation of 11,750 SF to create a multi-purpose space to consist of interactive data displays, workforce training classrooms, software research labs, a visualization theater, meeting spaces and collaborative hubs. Phase I is complete; Phase II will commence at the completion of the portion of Condo Board capital improvement projects which directly impact the continuation.

Graduate construction site for Big Data project

John Jay College

Center for Student Involvement and Leadership (CSIL) Renovation

Additional renovation of the existing Center for Student Involvement and Leadership (CSIL) suit on level L2. A series of new spaces have been made: open work area with club booths, private club rooms, private offices, kitchen/pantry area, reception desk and waiting area, spaces for Peer Ambassadors, storage room, and multipurpose public assembly room.

JJ construction site in progress

E-Learning Lab Renovation

The E-Learning Lab will create a new facility for video recording instructional classes and lectures. Renovations will create a multi-purpose room with loose furniture, built-in benches, custom wood sliding door, and a new interior observation window; an open work are with seven workstations, loose furniture; and recording studios with acoustic isolation.

JJ construction site in progress

Kingsborough Community College

Marina Reconstruction

Design and construction of a new marina, located on Sheepshead Bay in Brooklyn. The existing piers, boat lift ramp, boat life, water and electrical service were largely destroyed by Hurricane Sandy. The new piers will include mitigation strategies to lessen the impact of future storms on the site.

KCC construction site at the marina

T7 Building Roof Replacement

The design and replacement of the existing roof at the Kingsborough Community College T7 Building, located at 2131 Oriental Boulevard. The scope of work will include the removal of the existing 41 year old roof and the installation of new insulation, roof and parapet flashing, drains, gutters, leader and roof membrane. The design will provide a safe, easily maintained and energy code compliant building roof system that will lower energy use and maintenance work for the college.

KCC construction site at T7 building roof

Lehman College

Teaching & Learning Commons

This project will undertake alterations in the Old Gym Building to create a Center for Innovation for Research and Pedagogy (Teaching and Learning Commons) in the existing pool & locker area of the former gymnasium building. The existing space of approximately 6,500 square feet includes a a vaulted ceiling with three skylights above the pool and large windows. Offices, meetings rooms and a common multi-use, collaborative space is being created.

Lehman construction site for Teaching and Learning

Davis Hall & Gillet Hall Roof Replacements

The existing flat roofs of Davis and Gillet Halls are in poor condition and have reached the end of their useful life. This project will replace the roofs with insulated built-up roofing systems in order to make them water tight.

Lehman construction site at Davis Hall

Library Window Replacement

The windows and curtain wall systems of the Library building are leaking and have reached the end of their useful life. This project will replace the windows and curtain wall system with new energy efficient glazing systems.

Lehman construction site at library window

Medgar Evers College

Emergency Work Project

A comprehensive investigation to address an existing sinkhole observed by the collapsing of concrete paving adjacent to the retaining wall in the west portion of the parking lot at the Carrol Street building in Medgar Evers College (MEC).
The method to rectify will consist of excavating and replacing existing pavement; remove existing top 4 to 5 feet of existing soil; proof roll existing exposed soil; install backfill in 12� lifts; install new pavement. This option will address the top loose soils.

Medgar construction site for emergency work

Carroll St Bldg. C10B Concrete Ceiling Falling Carroll

The assessment, feasibility and recommendation for repairs at concrete slab above Caroll St. Basement C10B.

Medgar construction site at Carroll Street

Queens College

Queen Hall Library Reconstruction

Queen Hall, originally a 1956 high school, is being transformed into a modern and efficient office space for Queens College. The project upgrades the building with new HVAC systems, electrical and fire alarm improvements, and structural modifications to meet accessibility and current code requirements. Redesigned interiors will support 50–60 staff and reduce dependence on off-campus rentals. When complete, the renovated Queen Hall will provide a flexible, energy-efficient workplace that strengthens campus operations and supports future growth.

QC construction site at Queen Hall Library

Science Building & Remsen Chemistry Labs Renovation

The Science Building and Remsen Chemistry Labs are undergoing a major modernization to updated research and instructional spaces for Queens College. The project replaces aging lab infrastructure with new wet lab features, fume hoods, upgraded HVAC systems, and enhanced safety systems that meet all city, state, and federal standards. Outdated casework, fixtures, and lighting are being renewed, while new emergency showers and eye-wash stations strengthen lab safety. Once complete, the renovated labs will offer a high-quality environment that supports advanced research, enhances student training, and expands future teaching and research opportunities.

QC construction site at Science Building

York College

159th Street Underpass Enhancement

The Long Island Rail Road underpass at 159th Street is an important gateway connecting York College and Downtown Jamaica. The underpass has long suffered from poor lighting, worn paving, and an uninviting appearance. This project will transform the corridor with new lighting, signage, entrance gates, and upgraded pavers, creating a brighter, safer, and more welcoming pedestrian experience. The improvements will strengthen campus identity, enhance accessibility, and deliver a more vibrant connection between the college and the surrounding community.

York design site at 159th Street

PAC Interior Upgrades

After 30 years of continuous use, the York College Performing Arts Center showed significant wear throughout its theaters, lobby, and backstage areas. The project revitalizes the facility with upgraded seating, flooring, lighting, stage systems, and accessibility improvements. Enhancements include new dimming and house lighting controls, renovated restrooms, AV/IT and theatrical technology upgrades, improved stage finishes, new doors and railings, and a refreshed lobby. The improvements restore functionality, modernize the venue, and strengthen York College’s ability to serve both students and the broader Jamaica, Queens community.

York design site for PAC interior