CUNYcurrently has more than $1 billion worth of major projects, including both expansions and transformational initiatives, in the planning and design stage. Here is a sampling:
Borough of Manhattan Community College
Library/LRC
Design and renovation of the existing library and Learning Resource Center (LRC) on the fourth and fifth floors of the main campus building, located at 199 Chambers Street. The library, completed in 1982, has been in continuous use for 43 years without significant upgrades to its interior finishes, electrical, lighting, IT and HVAC systems. The current room and shelving layouts do not support current staff and student needs for collaborative study and research spaces.

Theatre 1 Sewer Repairs
Design and replacement of the existing theatre 1 bathroom drain and sewer lines located in the college’s main campus building at 199 Chambers Street. The existing 43-year-old waste lines connecting to the street sewer have broken in multiple locations causing the bathrooms and green room to smell of sewage. In order to remove and replace these lines, the existing floors and concrete slab in the men’s restroom, scene storage, dressing and green rooms, and the east hallway need to be cut and removed in order to install new waste lines along with a new ejector pump and ejector pit.

HVAC Upgrades
Design and replacement of nineteen (19) air handling units (AHUs) and eighteen (18) associated return fan units located at 199 Chambers Street. New units to be energy efficient AHUs. Work is to include air mixing boxes, filter boxes, heating and cooling coils, and fans. Both supply and return fans will be equipped with variable frequency drives (VFDs). This project will help align CUNYwith the City’s goals of reducing Greenhouse Gas (GHG) emissions in compliance with the requirements of NYC Local Law 97-2019.
The replacement and upgrades of the HVAC systems, as described above, is projected to yield a total annual cost savings of about $297,000. The energy savings represent an annual Greenhouse Gas (GHG) reduction of approximately 634 MT CO2e.

Enclosed Pedestrian Extension
The design and construction of a new third floor curtain wall with interior mezzanine extension and HVAC work at the Borough of Manhattan Community College’s main campus building, located at 199 Chambers Street.
The design will provide a safe, easily maintained and ADA code-compliant passageway connecting the two wings of the building’s third floor.

Bronx College
Hall of Fame Roof Restoration
The Hall of Fame of Great Americans, a NYC Landmark, is a 630-foot-long exterior colonnade housing 96 bronze busts of prominent citizens in American history. The limestone cornices have begun to spall & fall, creating a safety hazard.
The project proposes to replace all limestone cornices, decorative antefixes along the length of both sides of the colonnade, and miscellaneous masonry repairs on the Guastavino tile ceiling.

Philosophy Hall Roof
Built in 1912, Philosophy Hall is a NYC Landmark and a National Landmark, and its existing roof is the original clay tile roofing system. Although these types of roofs can last over a hundred years, there are active leaks in the building and replacement is necessary. This project will replace the roofing system, install new vapor barrier and restore all of the decorative copper fascia along the gutter.

Gould Memorial Library Elevator
Built in 1898, Gould Memorial Library (GML) is a NYC Landmark and is one of the finest examples of Beaux Arts architecture in the United States. However, because of modern building code violations, this historic building is currently underutilized. As of today, the building is not ADA complaint and the restrooms are not accessible except by walking up or down numerous flights of stairs.
This project proposes to build a new interior elevator to enable access to the most utilized spaces in GML.

Brooklyn College
New Science Facility
This project will demolish Roosevelt Hall and construct a 180,000-square-foot science facility with high-tech instructional laboratories, general-purpose classrooms, faculty offices, and support spaces. The new facility will support the college’s academic goal of transition to an interdisciplinary teaching model.

City College of New York
Administration Building Hardscape
The hardscape around all sides of the Administration Building needs restorative work. The existing hardscape has deteriorated (in certain places), which presents a hazard to pedestrians. Upon completion of this project, (note: currently in design), all pedestrian hazards will be remediated, and access to and from the Administration building, (and adjoining Marshak building), will be fully ADA-compliant.

College of Staten Island
Interdisciplinary High Performance Computational Center
This 175,000-square-foot facility will house a high-performance computer that will serve as a University-wide resource for computer-based modeling and simulation that are a requisite for performing advanced multidisciplinary research and the development of advanced technology systems. The facility will contain spaces dedicated to state-of-the-art scientific computing hardware, laboratories for visualization, computer labs flexibly designed to encourage collaborative student research, high-tech instructional laboratories, general-purpose classrooms and dedicated student work areas.

Graduate Center
Building Entry Security Upgrade
Upgrade to the Building Entrance Lobby and Security Desk to maximize space efficiency and enhance safety for students, visitors and staff. The proposed upgrade will include installation of new turnstiles at the lobby, compatible with the Library’s asset tracking system. The upgrade will enhance the experience lived by students and staff and will help to promote increased enrollment.

Hostos Community College
Allied Health and Science Building
The 170,000-square-foot facility will replace outdated facilities and with state-of-the-art classrooms and labs that support the college’s allied health programs in dental hygiene, radiological technology, and nursing as well as its growing engineering and natural science programs. The building also will provide dental and wellness clinics where the public will receive education and care.

Hunter College
Science and Health Professions Building
This project, a public-private partnership with Memorial Sloan-Kettering Cancer Center, will relocate Hunter College’s science programs, partially at its Brookdale campus on East 25th Street, within walking distance of the main campus on East 68th Street. East 74th Street. Hunter’s share will be an approximately 390,000-square-foot science building that will support its health professions programs, including nursing and physical therapy; provide research labs for its chemistry, biology, psychology, physics and astronomy departments; and provide a lecture hall.

Kingsborough Community College
Library Façade Renovation
New building envelope and roofs for the Robert J. Kibbee Library located at 2000 Oriental Blvd. The existing curtain wall and windows have reached the end of their useful life and the existing roofs and facade are leaking causing damage to the interior of the building. These leaks have rendered multiple areas of the library unusable due the threat of equipment and furniture damage and mold and mildew growth.
The new high performance energy efficient building envelope will restore the library to full use and result in significant energy savings and lower maintenance costs

Lighthouse Rotunda
Design and renovation of the Lighthouse Rotunda Conference Center in the college’s Marine and Academic Center (MAC) Building located at 2110 Oriental Blvd, NY. Due to the architectural quality of the space and its views, the Rotunda Conference Center is the college’s premier location to hold large conferences and meetings. The current space is over 11,000 SF and can seat 1,000 occupants. The project will replace the existing ceilings, flooring and lighting, motorized 16′ high retractable partitions, doors, existing HVAC branch duct work, grills and registers, and sprinkler branch lines and heads. The project will also include installation of additional power and data access points , upgrades to life safety systems, new window treatments and the removal of the current ADA code deficiencies

Performing Arts Center Renovation (PAC)
Design and renovation of the Performing Arts Center (PAC) building. The PAC, built in 1977, is the primary theatre on the campus and a resource for the community at large. Work to include alterations and upgrades to the PAC to meet current public assembly and ADA accessibility requirements Upgrades to the building’s fire rated construction, existing HVAC systems, acoustics, theatre house and stage lighting and audio systems.

Lehman College
Old Gym Building Windows
The Old Gym Building was constructed in 1934 and is two stories high. The existing windows are original steel non-thermal windows that experience chronic water and air infiltration. This project will replace all 393 windows with new thermal aluminum windows.

Shuster Mechanical Upgrades
The existing mechanical systems in Shuster Hall have reached the end of their useful life. This project will remove the old HVAC system and install new air handing units, hot water and chilled water distribution, new ductwork distribution throughout the building and new controls system.

Campus Wide Emergency Power Phase 2
Lehman College recently completed phase 1 of an Emergency Power Upgrade because their existing emergency generator infrastructure did not comply with current codes. This project will complete the remaining scope of the campus wide emergency infrastructure scope by installing two more generators and emergency power distribution to the remaining six buildings on campus.

Bedford Building Auditorium Rehab
Rehabilitation of the existing Bedford Building Auditorium to include the upgrade of architectural finishes, HVAC, lighting, sound, AV/IT, FA system in order to increase seating capacity. Scope will include environmental/Hazmat assessment and remediation. The existing auditorium is outdated and inefficient to accommodate the college’s current and expanding assemblage needs. The rehabilitation will increase seating capacity, support current needs and optimize functionality. The proposed rehabilitation will promote monetization opportunities for the college.

New Science Facility, Phase II
This 160,000-square-foot addition to the Phase I facility will include laboratories for teaching and research, science learning centers, offices and research facilities. Anthropology, biology, chemistry, environmental geographic and geological sciences, math and computer sciences, nursing, physics, astronomy and psychology will be housed in the new structure.

Medgar Evers College
Fitzgerald Gymnasium, Phase I
This 175,000-square-foot facility has been used for physical education, recreation, and competitive sports since 1957. The building contains two gymnasiums and locker rooms, a swimming pool, exercise science class labs, weight and training rooms, and a health and services center. This renovation project will provide the first phase of comprehensive interior and mechanical systems upgrades needed to meet the functional and instructional requirements of the college.

York College
Academic Village / Conference Center
This project will be built on the site of the existing Classroom Building. The approximately 160,000-square-foot facility will provide students with offices for student government clubs, lounges, conference rooms, a bookstore and a coffee shop. The classrooms will be convertible to state-of-the-art conference rooms that will be available for the community’s use.