Since 2000, about $3.8 billion worth of new construction and renovation projects has been completed. Much of this construction was designed to create space needed for academic programs, with the highest priority assigned to classroom and instructional laboratory facilities and to the replacement of temporary or leased space with permanent space. Here are several of the major projects:
Baruch College
The Newman Vertical Campus
This 17-story, 808,000-square-foot campus houses 100 high-technology classrooms and research facilities; a three-level athletics and recreation complex; a student activities center; theaters and an executive conference center; food court; and campus bookstore.

Borough of Manhattan Community College
Emergency Repair of the RHT AHU
Emergency repair of the HVAC unit serving the Richard Harris Terrace Meeting Room at the BMCC main campus building located at 199 Chambers Street.
This project is in response to the failure of the existing 40 ton air-cooled split system unit making this space unusable due to the extreme heat. The replacement of this air handling unit is critical to ensure the college has uninterrupted use of this space.

Fiterman Hall Replacement
This new facility replaced former office building that BMCC lost on 9/11. The 390,000-square-foot building contains classrooms, instructional laboratories, computer labs, faculty offices, administrative offices, student/faculty services, building services, and support functions, as well as an art gallery on the main floor.

Bronx Community College
Snow Hall Elevator
Snow Hall is a three-story brick building built in the 1940’s. Bronx Community College has repurposed the building for educational teaching spaces and administrative offices.
In order to bring the building into compliance with the NYC Building code and provide access for persons with disabilities, an elevator was required to be installed. This project built a new, exterior elevator to serve all floors of the building.

North Hall and Library
This new building replaces out-of-date instructional space with much-needed, state-of-the-art classrooms and modern library. The 98,000-square-foot facility has 15 large classrooms and a café on its first floor; the second floor houses the two-story information commons, along with a ring of small group-study rooms and lounge areas; the third story contains book stacks surrounding a balcony that overlooks the reading room.

Brooklyn College
The West Quad building
This glass-fronted building now serves as both a one-stop student services center and the hub of state-of-the-art physical education and recreational facilities. The 145,000-square-foot building includes a fitness center, a competition and auxiliary gymnasium, a seventy five-foot competition pool, racquetball and squash courts, dance studio, multipurpose/volleyball room, and locker rooms.

LaGuardia Hall
This extensive renovation and expansion of Brooklyn College’s original library, whose commanding clock tower serves as the College’s emblem, added computerized classrooms; a New Media Center; and a 145-seat auditorium fully equipped with state-of-the-art video and computer technology.

City College
Spitzer Atrium Roof
Prior water infiltration through the Spitzer roof amphitheater, has resulted in interior leaks, damage to the atrium ceiling, and resulted in the atrium being nearly unusable. However, this now completed project, provides unrestricted use of the atrium, along with a new ceiling and interior finishes. The amphitheater and roof assembly were also restored, and water infiltration mitigated.

Renewable Energy and Integrated System Project
This completed installation takes advantage of the existing North Academic Center (NAC) parking lot, and has provided a new 140kW solar canopy and control system, with net metering capabilities, and (10)EV car charging stations. The system will harvest solar energy with the goal of reducing the campus ‘carbon footprint’, and providing support to ongoing green energy research, being conducted by the College’s Engineering program, at the Steinman Hall Building.

The Bernard and Anne Spitzer School of Architecture
Constructed over the framing of a building erected in the 1950s, the 182,000-square-foot architecture school now houses studios, offices, classrooms, an auditorium, a digital design laboratory, an amphitheater, a model shop, a library and an exhibit area in the five-story atrium.

The Towers; a public/private partnership
The first residence hall built at CCCNY, the Towers houses 164 fully furnished suites, accommodating 589 residents.

Marshak Science Building New Facade
This project replaced the façade and installed a new curtain wall in the building, which currently houses most of the college’s science research facilities.

City Tech
Pearl Building Facade Restoration and Window Replacement
The ‘Pearl Building’, built in 1922, last underwent an exterior renovation in the 1950s. In recent years, the windows and metal panels have showed signs of severe deterioration. The Pearl Building has now received new windows, and new metal panel cladding, and the campus seems to very content with both the quality of work and results.

Pearl Building 3rd Floor Renovations
The interior of the Pearl building 3rd floor, was vacated due to departments moving to the New Academic Building.
This project included relocating administration departments from leased facilities to the 3rd floor, and also the renovation of the entire floor, to provide office suites, conference rooms, restrooms, a lounge area and new AV and IT, which is now all completed .

The Namm Hall Facade
Renovation of the facade, including installation of energy-saving windows in the 497,000 square-foot facility.

College of Staten Island
The 2M Building at the College of Staten Island (CSI) dates from the 1940s and was originally part of the Willow brook State School, a state-run institution for children with intellectual disabilities. The building was robustly constructed, making it an excellent candidate for adaptive reuse—similar to its twin, Building 1M.
After the Willow Brook State School closed in 1987, the 2M Building remained vacant until CSI took over the site in 1993. Since then, portions of the building have been renovated for educational purposes.
Current Use and Conditions:
The Jay and Lucille Chazanoff School of Business currently occupies the south wing on the 2nd floor.
The 1st floor of the south wing renovation has been substantially completed for the Center for Big Data Business Analytics (CBDBA).
A new atrium, aluminum curtain wall system, tempered glass canopy, ADA ramp, and elevator have been added at the southern elevation.
The cellar was renovated in 2004, including new sprinklers, utilities, fire alarm, lighting, restrooms, and office/storage spaces.

The Dolphin Cove Residence Hall
Public/Private Partnership
This is the first residence hall at CSI. The two buildings accommodate 454 students.

Graduate Student Building
Formerly home to the B. Altman Department store in midtown Manhattan, the 350,000-square-foot landmark building was redesigned as a state-of-the-art facility to meet the needs of doctoral study students at the center.

Apartments – Public/Private Partnership
The Graduate Center Apartments are located in East Harlem, adjacent to the new Silberman School of Social Work at Hunter College. The 55,500-square-foot building, which opened in 2011, has 110 beds, providing attractive and affordable housing for CUNYgraduate students, postdoctoral fellows and faculty members.

CUNYSchool of Law
Renovation
As a result of a public-private partnership with Citigroup, CUNYSchool of Law moved from its Flushing Campus to 2 Court Square in Long Island City. The University renovated its 260,000-square-foot condominium into new classrooms, a library, clinic and offices.

Graduate Center
GSUC-Cooling Tower Upgrade
Upgrade the existing cooling towers at the Graduate Center for improved ambient conditions conducive to a comfortable facility for students and staff

Hostos Community College
Dental Hygiene Patient Clinic
The renovation of the college’s 500 Grand Concourse building included the construction of a new 24-chair dental hygiene facility that serves the local Bronx community.

Hunter College
School of Social Work
A property in Harlem was purchased to relocate the school from its current leased facility on Manhattan’s Upper East Side, giving the school a permanent, owned facility. This new 147,000-square-foot building includes instructional space, a library, centers and institutes, as well as houses the CUNYSchool of Public Health and faculty housing.

Roosevelt House Renovation
The 21,000-square-foot, historic Roosevelt House was renovated to accommodate the college’s Public Policy Institute and includes an auditorium as well as instructional and administrative space.

John Jay College
Fitness Center Relocation
The Fitness Center in the Haaren Hall Athletic Facilities was relocated from the 6th floor to the third floor along with the Physical Education/Athletic support spaces. Renovations were made to the existing Racquetball Court (4th floor), third floor Corridors, Reception Area, Trainer and Equipment Storage Room, and Laundry. Gymnasia upgrades were made including replacing the baseball netting and equipment, bleachers, electrical, and refurbishing the gym floor

New multi-use building
This 600,000-square-foot building houses classrooms and lecture halls, modern forensic science labs, instructional and research laboratories, faculty offices, student activities and academic support services, administrative offices, and campus services. Additionally, there is an urban quad on the roof of the five-story base of the building where it connects to Harran Hall.

Kingsborough Community College
T1 Building Canopy
Design and construction of a canopy for the T1 Building located at 2085 Oriental Blvd. This building serves as the University Application Processing Center for all of ³Ô¹ÏÊÓÆµ. The absence of a canopy at the stock room made any deliveries vulnerable to the weather

Art Museum Entrance (KAM)
Design and emergency repair and replacement to the lintels and loose bricks and mortar at the Kingsborough Art Museum (KAM) entrance at the Arts and Sciences Building located at 2120 Oriental Boulevard

The Academic Village
This 42,000-square-foot complex houses offices and classrooms, including space for tourism and hospitality, continuing education, and counseling programs, as well as a computer lab, childcare center and welcome center.

LaGuardia Community College
Center 3
Initial renovations include: One-stop Student Services area, classrooms, faculty offices and building infrastructure completed through a series of projects.

Lehman College
Music Building Chimney Restoration
The Music Building was built ca. 1931. Its chimney rises approximately 50 feet above the main roof, is octagonal in plan with a diameter of approximately 12 feet, and encloses the cylindrical flue of the boiler that resides in the basement of the building. It is framed by structural steel and clad in limestone and metal louvers. When the boilers were replaced, it was observed that the stone and masonry were under distress. This project replaced the original steel framing with stainless steel structural elements. Salvageable limestone units were re-installed and new masonry units replaced others.

Department of Social Work Renovation
The Department of Social Work is currently housed in Carman Hall in spaces that are insufficient and lacking. This project renovated approximately 10,000 square feet of Davis Hall to expand the department’s office and support spaces. This renovation includes 34 offices, and various support spaces and gives the Department of Social Work a new identity at Lehman College.

Carman Hall Lecture Halls Renovation
Carman Lecture Hall renovated rooms B34, B36, and B39. The scope provided new fixed auditorium seating and the equipment and technology to create multi-functional, multi-media lecture halls. The scope included new lighting, flooring, improved acoustics, mechanical systems, ADA accessibility and obtaining Place of Assembly approvals.

Multimedia Center
This 22,500-square-foot facility now offers a profession-quality production studio as well as a teaching facility for students studying a wide range of disciplines–graphic arts, journalism, film, theater and music. The center also provides a new home for local filmmakers, digital artists, producers, and musicians who need access to a state-of-the-art century facility.

New Science Facility, Phase I
This 69,000-square-foot building is the first of a three-phase facility that will create the cornerstone of the sciences at Lehman. Designed to showcase the college’s strength in plant science teaching and research, Phase I includes laboratories for interdisciplinary teaching and research, science learning centers, offices, and a research facility. The project incorporates a number of environmentally sustainable strategies and is the first CUNYbuilding to receive a LEED Gold Rating from the U.S. Green Building Council.

Medgar Evers College
Bedford Parking Light Upgrade
Replacement of 12 existing Metal Halide exterior light fixtures with 12 new LED RAB X34 Series 15K Lumens fixtures on 4 existing lamp posts (3 fixtures per post). An upgrade to the existing outdated parking lot lighting system is required to provide enhanced security coverage for students and staff to access cars at night. The proposed exterior lighting upgrade is required in order maintain a safe and secure environment and avoid risk of liability to the college.

Carroll St Ext Upgrades
Roof replacement at Carroll Street Building was completed, warranty remains pending.

Academic Building I
This building will help meet the college’s severe space deficit, providing state-of-the-art classrooms and computer labs for all disciplines, as well as instructional labs and faculty offices for the School of Science, Health and Technology. The 195,000-square-foot structure also houses the college’s main dining facility.

School of Business and Student Support Services Building
The three-story “S” Building provides almost 45,000 square feet of new classrooms and administrative offices.

New York Simulation Center for the Health Sciences
Public/Private Partnership
This joint venture with NYU Langone Medical Center is a 25,000-square-foot ,state-of-the-art first responder, emergency response, and health care simulation training facility located at Bellevue Hospital.

Queens College
Getz Hall Renovation – Speech & Hearing Learning Center
Gertz Hall has been transformed into a modern, fully updated Speech and Hearing Center designed to support both clinical services and student training. The renovation reconfigured tight therapy rooms, improved internal circulation, and upgraded aging HVAC and electrical systems. New finishes and a refreshed layout create a more comfortable, efficient, and professional environment for patients, students, and faculty. The enhanced facility strengthens the Speech-Language Pathology Department’s academic and clinical mission by offering a more accessible, welcoming space that supports high-quality therapy services and provides students with an improved setting for hands-on learning and clinical education.

Powdermaker Hall
The renovation of this 216,650-square-foot facility has provided state-of-the-art technology for the college’s major classroom and laboratory building.

The Summit Residence Hall; a public-private partnership
The college’s first student residence hall is a 506-bed facility, with three wings of varying stories to complement the heights of the surrounding buildings. The Summit’s design has met Leadership in Energy and Environmental Design (LEED) requirements for Gold certification.

Remsen Hall Addition and Renovation
A 26,000-square-foot addition to Remsen Hall will house the college’s chemistry instructional laboratories. It provides state-of-the-art, code-compliant and energy-efficient laboratories. In the next phase, other renovations in Remsen Hall will be undertaken to convert vacated spaces to physical, bioorganic, and biochemistry research labs.

Queensborough Community College
Kupferberg Holocaust Resource Center and Archives
This 8,000-square-foot renovation and new construction project created a renowned educational center, including an exhibition gallery, archives, resource rooms and offices.

York College
Child Care Center
This 14,500-square-foot facility now provides child care and early childhood education for children of York students. The center, built on the site of the historic St. Monica’s Catholic Church, has eight classrooms, a Parent/Staff Resource Room, a food preparation area and offices.